Asked by seydi ortiz on May 22, 2024
Verified
Proper grounding procedures for a PLC installation specify that:
A) all enclosures, CPU and I/O chassis, and power supplies be connected to a single low-impedance ground.
B) paint or nonconductive materials should be scraped away to provide good ground connections.
C) all ground connections should be made using star washers.
D) all of these.
Grounding Procedures
The methods and practices used to connect electrical systems or equipment to the earth to ensure safety and prevent static or interference.
Low-impedance Ground
A grounding method or system that has a very low electrical resistance path to the earth to ensure safety and reduce the risk of electrical shock or fire.
- Absorb knowledge about the critical considerations in PLC installation involving the positioning, protection of enclosures, grounding techniques, suppression of electrical noise, and dealing with changes in voltage.
Verified Answer
JH
Juana HerreraMay 23, 2024
Final Answer :
D
Explanation :
All of these options are important in properly grounding a PLC installation. Connecting all enclosures, CPU and I/O chassis, and power supplies to a single low-impedance ground ensures consistency in grounding throughout the system. Scraping away paint or nonconductive materials provides a better connection point for grounding, and using star washers helps to ensure a strong and reliable connection.
Learning Objectives
- Absorb knowledge about the critical considerations in PLC installation involving the positioning, protection of enclosures, grounding techniques, suppression of electrical noise, and dealing with changes in voltage.
Related questions
Typically, PLC Systems Installed Inside an Enclosure Can Withstand a ...
The Authoritative Source on Grounding Requirements for a PLC Installation ...
When Routing Power and I/O Signal Wiring to and Within ...
A Good Location for a PLC Enclosure Is Close To ...
In Addition to Being an Important Safety Measure, Proper Grounding ...