Asked by Rafael Leyva on Jun 02, 2024
Verified
A _________ conversion involves running the old and new systems at the same time.
A) direct
B) parallel
C) phased
D) pilot
Parallel Conversion
A method of implementing a new system where the old and new systems run simultaneously for a period of time to ensure the new system works correctly.
Old Systems
Outdated or legacy technology and processes that are still in use within an organization.
- Gain insight into multiple system conversion techniques and where they are applied.
Verified Answer
NC
Nikki CastellanetaJun 09, 2024
Final Answer :
B
Explanation :
A parallel conversion involves operating both the old and new systems simultaneously to compare their performance and ensure the new system works correctly before discontinuing the old one.
Learning Objectives
- Gain insight into multiple system conversion techniques and where they are applied.
Related questions
A _________ Conversion Introduces Components of the New System in ...
_________ Conversion Is the Most Risky
The Monthly Cost of Renting Manufacturing Equipment Is ...
Conversion Costs Are Generally Added at Specific Points Throughout a ...
Bims Corporation Uses the Weighted-Average Method in Its Process Costing ...