A material requirements plan contains information with regard to all of the following except
A) quantities and required delivery dates of all subassemblies.
B) quantities and required delivery dates of final products.
C) the capacity needed to provide the projected output rate.
D) inventory on hand for each final product.
E) inventory on hand for each subassembly.
Material Requirements Plan
A system used in manufacturing to calculate the materials and components needed to manufacture a product, ensuring materials are available for production and products are available for delivery.
Subassemblies
Components that are assembled separately but are used as parts of a final assembly or finished product.
Projected Output Rate
An estimated rate of production for future periods based on current data and trends, forecasting the volume of output.
- Understand the critical parts and inputs required for an effective gross material requirements strategy.
Verified Answer
Learning Objectives
- Understand the critical parts and inputs required for an effective gross material requirements strategy.
Related questions
Which of the Following Statements Regarding the Gross Material Requirements ...
Which of the Following Best Describes a Gross Material Requirements ...
The MPS Calls for 110 Units of Product A ...
Which of the Following Are Limitations of Rules-Based Dispatching Systems ...
MRP Can Be Effective Only If Very Accurate Lot Sizes ...