A production engineer wanted to know how long it should take to make metal rods with a lathe. Four rods were made, and the time was recorded. The results were 28.5 seconds, 29.2 seconds, 31.8 seconds, and 29.7 seconds. Compute the total time to make all four rods.
Production Engineer
A professional who works to improve the production process in manufacturing, aiming to increase efficiency, product quality, and worker safety.
Metal Rods
Long, thin pieces of metal used in a variety of construction and manufacturing applications.
- Conduct basic mathematical operations such as addition, subtraction, multiplication, and division to tackle practical problems.
- Utilize mathematical reasoning to interpret and solve problems involving time and material cost estimation.
Verified Answer
CB
Learning Objectives
- Conduct basic mathematical operations such as addition, subtraction, multiplication, and division to tackle practical problems.
- Utilize mathematical reasoning to interpret and solve problems involving time and material cost estimation.