Alghamdi Corporation keeps careful track of the time required to fill orders. The times required for a particular order appear below:
Alghamdi Corporation keeps careful track of the time required to fill orders. The times required for a particular order appear below:    Required:a. Determine the throughput time.b. Determine the manufacturing cycle efficiency (MCE).c. Determine the delivery cycle time. Required:a. Determine the throughput time.b. Determine the manufacturing cycle efficiency (MCE).c. Determine the delivery cycle time.

Throughput Time

The total time taken for a unit to pass through a production process, from start to finish, including both processing time and waiting time.

Manufacturing Cycle Efficiency

A measure of the efficiency of the production process, calculated as the ratio of value-added time to total cycle time.

Delivery Cycle Time

The total time taken from when a customer places an order to the time the product is delivered to the customer.

  • Determine the throughput time, measure the productivity of the manufacturing cycle (MCE), and evaluate the delivery time frame in regards to quality and performance oversight.
verifed

Verified Answer

VG
Vicki GloriaJul 30, 2024
Final Answer :
a.Throughput time= Process time + Inspection time + Move time + Queue time= 1.1 hours + 0.1 hours + 2.4 hours + 9.3 hours= 12.9 hoursb.MCE = Value-added time/Throughput time= 1.1 hours/12.9 hours = 0.09c.Delivery cycle time = Wait time + Throughput time = 10.4 hours + 12.9 hours = 23.3 hours