An engineering change notice is used to change a(n)
A) MRP.
B) MPS.
C) ERP.
D) BOM.
E) DRP.
Engineering Change Notice
A document used in engineering and manufacturing that outlines modifications to a product's design or manufacturing process.
BOM
Bill of Materials; a comprehensive list detailing the materials, parts, and components needed to manufacture a product.
- Become familiar with the crucial aspects and steps involved in updating a Bill of Materials (BOM), and its repercussions on the production workflow.
Verified Answer
MV
Manjari Verma6 days ago
Final Answer :
D
Explanation :
An engineering change notice (ECN) is typically used to change a Bill of Materials (BOM) in order to update or modify the parts or components required for a product.
Learning Objectives
- Become familiar with the crucial aspects and steps involved in updating a Bill of Materials (BOM), and its repercussions on the production workflow.
Related questions
A Bill of Material Must Be Updated with the Corrected ...
The ________ Is the Input to Material Requirements Planning Which ...
Which of the Following Statements Regarding Wheeled Coach Is False ...
The Bill of Material Contains Information Necessary to ...
A Bill of Materials Is a Document That Lists the ...