Asked by Osano Enoch on May 11, 2024
Verified
Materials requirement plan (MRP) is most effective at managing independent demand items.
Materials Requirement Plan (MRP)
A system for calculating the materials and components needed to manufacture a product, ensuring the right materials are available for production at the right time.
Independent Demand Items
Products for which demand is not influenced by the demand for other products, typically finished goods or spare parts.
- Detail the significance of capacity requirements planning (CRP) and materials requirements planning (MRP) in managing production processes.
Verified Answer
KS
Karanpreet SinghMay 18, 2024
Final Answer :
False
Explanation :
MRP is most effective at managing dependent demand items, as it schedules the production and purchase of components based on the demand of the final product.
Learning Objectives
- Detail the significance of capacity requirements planning (CRP) and materials requirements planning (MRP) in managing production processes.
Related questions
Resource Requirements Planning (RRP) Is a Long-Run, Macro-Level Planning Tool
Capacity Requirements Planning (CRP) Is Used to Check the Feasibility ...
Which of the Following Are Limitations of Rules-Based Dispatching Systems ...
MRP Is Generally Practiced on Items with Dependent Demand
MRP Can Be Effective Only If Very Accurate Lot Sizes ...