Refer to Table 13-15. What is the average variable cost of producing 400 units of output?

Average Variable Cost

The total variable costs of production divided by the quantity of output produced; it varies with the level of output.

  • Learn the procedure for deriving average fixed cost, average variable cost, and average total cost from the available production and cost figures.
verifed

Verified Answer

RV
Robert Von Der BeckeJun 15, 2024
Final Answer :
AVC = VC/Q = $20/400 = $0.05.