Should the company add Location A or Location B based on total construction plus operating cost and why?

A) Location B because it is cheaper by $350.
B) Location A because it is cheaper by $2500.
C) Location B because it is cheaper by $200.
D) Location A because it is cheaper by $200.

Total Construction Cost

The complete financial expenditure involved in constructing a building or infrastructure, encompassing material, labor, equipment, and indirect costs.

Operating Cost

Refers to the ongoing expenses associated with the running of a business, such as utilities, rent, payroll, and maintenance.

Location Decision

The process of selecting a geographical location for a company’s operations, facilities, or investments, considering factors such as cost, accessibility, and legal requirements.

  • Employ linear programming models to ascertain the least costly solutions within supply chain networks.
verifed

Verified Answer

JD
Jerulyn DizonJul 23, 2024
Final Answer :
D
Explanation :
Location A is cheaper by $200 when considering total construction plus operating costs. This means that over the long-term, Location A will be more cost-effective than Location B. Therefore, the company should choose Location A.