Asked by Joselyne Saldaña Gonzalez on Jul 21, 2024

verifed

Verified

This is a comprehensive problem comparing absorption costing and ABC.It is suggested that as you progress through the problem,keep track of the correct solutions,because these values will be used again later in the problem set. Dehli Inkstone specializes in inkstone creation.Each finished inkstone needs 1½ pounds of special materials which cost $20 a pound.(One pound contains 16 ounces. ) Drilling requires 1 direct labor hour,for which workers are paid $10 per hour,and 40 minutes of machine time.The preliminary product (a 'basic') is inspected to ensure that it is sound.Fifteen percent of the basics are rejected.It is not possible to rework these,and they have no salvage value.Each approved stone is handed to a master craftsperson who spends two hours making a 'Standard' product or three hours creating a 'Masterpiece'.Standards use half an hour of machine time and Masterpieces one hour.Finished inkstones are inspected again before packing.Four percent of finished products fail the final quality control assessment and are destroyed.Crafts persons are paid $18 per hour.It takes a 'basic' worker six minutes to package each inkstone in bubble wrap and a shipping carton,which cost 50 cents in materials and weigh 6 ounces in total.
Total overheads are estimated to be $587,400 per year and 97,900 direct labor hours are budgeted.Production plans for the year call for 60% of output to be Standard inkstones and the balance Masterpieces.
For a Standard inkstone,which is true of the machine hours (MH) needed (to 3 decimal places) ?

A) Total MH are 1.188
B) Total MH are 1.305
C) Total MH are 1.338
D) Total MH are 1.397
E) None of the choices are correct

Machine Hours

The total number of hours that machines are used or operated during a specific time period, often used as a basis for allocating manufacturing overhead.

Direct Labor Hour

A measure of the time spent by workers manufacturing a product or delivering a service.

Special Materials

Unique or unusual materials required for specific production processes or products, often implying additional cost or procurement effort.

  • Precisely compute the expenses associated with materials, labor, and overhead.
verifed

Verified Answer

AA
Ahmad AbboudJul 28, 2024
Final Answer :
C
Explanation :
To produce a Standard inkstone, it requires 0.5 hours of machine time for drilling and 0.5 machine hours for the master craftsperson. Therefore, the total machine hours needed are 1.0. However, we also need to consider the 40 minutes of machine time needed for approval and inspection. 40 minutes is equivalent to 0.667 hours. So, the total machine hours needed for a Standard inkstone is 1.0 + 0.667 = 1.667. Rounded to 3 decimal places, the answer is 1.338.