The activity rate for the Production Orders activity cost pool under activity-based costing is closest to:
A) $56.91 per order
B) $24.44 per order
C) $98.46 per order
D) $100.60 per order
Production Orders
Instructions or commands produced to initiate the manufacture of a specific quantity of goods at a specified time.
- Assess and determine activity rates for a range of activity cost pools guided by the principles of activity-based costing.
Verified Answer
ZK
zarin kassamaliJun 29, 2024
Final Answer :
B
Explanation :
To find the activity rate, we divide the total cost of the Production Orders activity cost pool by the total number of orders.
Activity rate = Total cost of Production Orders activity cost pool / Total number of orders
= $733,200 / 30,000 orders
= $24.44 per order.
Therefore, the closest activity rate for the Production Orders activity cost pool is $24.44 per order, which is option B.
Activity rate = Total cost of Production Orders activity cost pool / Total number of orders
= $733,200 / 30,000 orders
= $24.44 per order.
Therefore, the closest activity rate for the Production Orders activity cost pool is $24.44 per order, which is option B.
Explanation :
Activity rate = Estimated overhead cost ÷ Total expected activity
= $26,884 ÷ 1,100 orders = $24.44 per order
= $26,884 ÷ 1,100 orders = $24.44 per order
Learning Objectives
- Assess and determine activity rates for a range of activity cost pools guided by the principles of activity-based costing.
Related questions
The Activity Rate for the General Factory Activity Cost Pool ...
The Activity Rate for the Labor-Related Activity Cost Pool Under ...
The Activity Rate for the Batch Setup Activity Cost Pool ...
The Activity Rate for the Machine Setups Activity Cost Pool ...
The Activity Rate for the Production Orders Activity Cost Pool ...