Which of the following statements is most complete and correct?

A) Activity-based costing uses non-volume-based cost drivers only.
B) Activity-based costing uses volume-based cost drivers.
C) Activity-based costing recognises that both volume-based and non-volume-based cost drivers may be appropriate.
D) None of the given answers.

Activity-based Costing

A methodology that assigns production costs to products based on the activities required to produce them, aiming for more accurate cost allocation.

Volume-based

A pricing or costing method that changes based on the amount of goods or services produced or sold.

Non-volume-based

Refers to costing methods that allocate costs based on factors other than the volume of production, such as time or complexity.

  • Understand the distinct classifications of costs within activity-based costing.
verifed

Verified Answer

RS
Rojie SenarathJun 13, 2024
Final Answer :
C
Explanation :
Activity-based costing recognises that both volume-based and non-volume-based cost drivers may be appropriate. While volume-based cost drivers are commonly used in activity-based costing, non-volume-based cost drivers can also be used when they provide a better representation of the actual cost driver for a particular activity. Therefore, statement A is incorrect and statement B is only partially correct. Statement D is not a valid answer as all given answers are either partially correct or incorrect.