Which of the following statements regarding Wheeled Coach is false?

A) Wheeled Coach has found competitive advantage through MRP.
B) Wheeled Coach builds ambulances in a repetitive process.
C) Wheeled Coach's MRP system allowed the company to meet tight schedules, but caused inventory to rise.
D) Wheeled Coach's MRP system maintains excellent record integrity.
E) Low inventory and high quality are two positive outcomes of Wheeled Coach's use of MRP.

Wheeled Coach

A reference to a company or concept in the context of efficient manufacturing or service processes, possibly related to emergency vehicles.

Competitive Advantage

The attributes or conditions that allow a company to produce goods or services better or more cheaply than its competitors.

MRP System

Material Requirements Planning System; a computer-based inventory management system designed to assist in production planning and inventory control.

  • Discern the assortment of demand forecasting methodologies and their scheduling applications in manufacturing environments.
  • Understand the importance and process of updating a Bill of Materials (BOM) and its impact on production.
verifed

Verified Answer

RM
Rebecca MartinMay 14, 2024
Final Answer :
C
Explanation :
Wheeled Coach's MRP (Material Requirements Planning) system is designed to efficiently manage inventory levels and production scheduling, aiming to minimize inventory while meeting production schedules. The statement that the MRP system caused inventory to rise contradicts the primary goal of MRP systems, which is to keep inventory levels as low as possible while ensuring materials are available for production when needed.