Asked by Alaysia Mcnill on Jul 18, 2024
Verified
Which of the following techniques is not a technique for dealing with a bottleneck?
A) Schedule throughput to match capacity of the bottleneck.
B) Increase capacity of the constraint.
C) Have cross-trained employees available to keep the constraint at full operation.
D) Develop alternate routings.
E) All are tools for dealing with bottlenecks.
Throughput
The rate at which goods or services are produced or processed in a system.
Bottleneck
A point of congestion in a production system where the demand outpaces the production capacity, leading to delays and reduced throughput.
Cross-Trained Employees
Individuals within an organization who have been trained in multiple skills or tasks, allowing them to perform a variety of roles as needed.
- Comprehend and implement the fundamentals of bottleneck management to enhance system efficiency.
Verified Answer
Learning Objectives
- Comprehend and implement the fundamentals of bottleneck management to enhance system efficiency.
Related questions
Explain the Importance of a Bottleneck Operation in a Production ...
A Useful Tactic for Increasing Capacity Is to Redesign a ...
Substantial Research Has Proved That the Only Successful Method of ...
Eliminating Nonproductive Processing Time Is Particularly Important in a Bottleneck ...
In Setting Up a Combined Payment Plan for Salespeople, the ...