Answers

AC

Answered

Research with students seeking full-time employment found that having a negative attitude prompted the students to do a better job in all phases of the job search.

On Sep 26, 2024


False
AC

Answered

Tough Hardware purchases raw materials and processes those purchases through a receiving/inspection process prior to stocking for production. Tough places three purchase orders for materials for production and receives the goods that day. The first purchase order is for 2,500 1/2" × 96" milling blanks at $2.75 each. The second is for 4,000 pieces of 48" × 96" × 1" sheet steel at $15.55 each. The third purchase order is for five 5-gallon drums of milling lubrication oil at $475.00 per barrel.?

The receiving/inspection process is completed and the goods are transferred from Receiving Inventory to Raw Materials. The Receiving/Inspection Department assigns manufacturing overhead of $55.00 per purchase order as well as $2.75 per piece on metal goods and $35.00 per container on fluids. All labor is allocated through overhead.

(a) Prepare the journal entry to purchase and receive these items to Receiving Inventory on account.
(b) Assign overhead to the metal goods.
(c) Assign overhead to the fluid goods.
(d) Transfer all goods to Raw Materials Inventory.

On Sep 23, 2024