Placker Corporation uses a job-order costing system with a single plantwide predetermined overhead rate based on machine-hours.The company based its predetermined overhead rate for the current year on total fixed manufacturing overhead cost of $155,000, variable manufacturing overhead of $3.40 per machine-hour, and 50,000 machine-hours.Recently, Job A881 was completed with the following characteristics:
The total job cost for Job A881 is closest to:
A) $3,595
B) $2,945
C) $2,950
D) $1,295