Answers

CC

Answered

The ________ is the form a message takes,and the ________ is the system used to deliver a message.

A) channel; network
B) medium; channel
C) format; medium
D) channel; medium

On Sep 27, 2024


B
CC

Answered

A(n) ________ provides feedback to the capacity plan, master production schedule, and production plan so planning can be kept valid at all times.

On Sep 23, 2024


closed-loop MRP system