Answered
The rate established at the beginning of a period that uses estimated overhead and an allocation factor such as estimated direct labor,and that is used to assign overhead cost to jobs,is the:
A) Predetermined overhead rate.
B) Overhead variance rate.
C) Estimated labor cost rate.
D) Chargeable overhead rate.
E) Miscellaneous overhead rate.
On Jun 28, 2024