Technics Inc., a manufacturing company, utilizes job order costing. Each division establishes its own estimates regarding overhead, which are as follows:
If Division A allocates overhead on the basis of machine hours and Division B allocates overhead as a percentage of direct labor costs, what would the predetermined overhead rate be for each division?