Answers

JE

Answered

Pay levels are limited in part by profitability of the firm and market pay.

On Jul 23, 2024


True
JE

Answered

An assembly line with 11 tasks is to be balanced. The longest task is 3 minutes, the shortest task is 0.8 minutes, and the sum of the task times is 25 minutes. The line will operate for 750 minutes per day.
a. Determine the minimum and maximum cycle times.
b. What range of output is theoretically possible for the line?
c. What is the minimum number of stations needed if the maximum output rate is to be sought?
d. What cycle time will provide an output rate of 300 units per day?

On Jul 20, 2024


Minimum cycle time is 3 minutes. Maximum cycle time is 25 minutes. Maximum output is 750/3 = 250; minimum output is 750/25 = 30. For maximum output, 25/3 = 8.33 or 9 stations will be needed. To produce 300 units per day requires a 2.5-minute cycle time.
JE

Answered

Race, religion, political belief, and criminal conviction are prohibited grounds for discrimination in all provinces of Canada.

On Jun 23, 2024


False
JE

Answered

If the price elasticity of demand for a product is equal to 0.5, then a decrease in price of 10 percent will increase quantity demanded by

A) 20 percent.
B) 0.5 percent.
C) 5 percent.
D) 0.05 percent.

On Jun 19, 2024


C
JE

Answered

The concept of ____________ ethics states that the rightness of an action is determined by evaluating the pros and cons of its consequences.

On May 24, 2024


end-result
JE

Answered

Once Linda's attorney presented all the evidence, Ronaldo's attorney could ask for a[n] ________.

A) directed verdict
B) closing argument
C) immediate dismissal
D) redirect examination
E) mistrial

On May 20, 2024


A