Explain the difference between a gross requirements plan and a net requirements plan.

Gross Requirements Plan

A schedule that specifies the amount and timing of future material and component requirements necessary to fulfill the production plan.

Net Requirements Plan

An output of the manufacturing planning process that identifies the quantity and timing of future material or product demands based on current inventory levels and scheduled supply.

  • Differentiate between gross and net requirements plans and their implications in MRP.
verifed

Verified Answer

BH
Brionna HavensMay 14, 2024
Final Answer :
A gross requirements plan multiplies each part quantity in the bill of material by the number of top level parents needed. This ignores any inventory on hand, whether of parents or children. A net requirements plan starts with the top level requirements from the bill of material, then subtracts inventory of that item on hand. This net requirement becomes the gross requirement to the next level of the product structure.