Asked by calista Williams on Jul 09, 2024

verifed

Verified

Given the following data, find the expected breakdown cost. The cost per breakdown is $100.
 Number of breakdowns 0123 Monthly frequency 520232\begin{array} { | l | c | c | c | c | } \hline \text { Number of breakdowns } & 0 & 1 & 2 & 3 \\\hline \text { Monthly frequency } & 5 & 20 & 23 & 2 \\\hline\end{array} Number of breakdowns  Monthly frequency 0512022332

Breakdown Cost

The expenses related to the failure or maintenance of machinery, equipment, or systems.

  • Calculate expected breakdown costs from given data.
verifed

Verified Answer

KB
Kaur Banwait SainiJul 14, 2024
Final Answer :
 Number of breakdowns 0123 Total  Monthly probability .10.40.46.041.000\begin{array} { | l | c | c | c | c | l | } \hline \text { Number of breakdowns } & 0 & 1 & 2 & 3 & \text { Total } \\\hline \text { Monthly probability } & .10 & .40 & .46 & .04 & 1.000 \\\hline\end{array} Number of breakdowns  Monthly probability 0.101.402.463.04 Total 1.000 Expected number of breakdowns per month = (0 ∗ .10) + (1 ∗ .40) + (2 ∗ .46) +
(3 ∗ .04) = 1.44; Expected cost of breakdowns = 1.44 ∗ $100 = $144