Which of the following is not an effectiveness criterion for scheduling?

A) minimizing customer waiting time
B) minimizing completion time
C) minimizing WIP inventory
D) maximizing utilization
E) maximizing flow time

Minimizing Completion Time

The objective of scheduling and operational strategies aimed at reducing the total time required to complete a set of tasks or production processes.

Customer Waiting Time

Customer waiting time is the duration a customer has to wait before receiving a service or product, influencing satisfaction and perception of service quality.

WIP Inventory

Work-in-Process (WIP) Inventory consists of materials and components that have begun their transformation process but are not yet completed products.

  • Analyze effectiveness criteria for scheduling.
verifed

Verified Answer

CS
Campus SafetyMay 10, 2024
Final Answer :
E
Explanation :
Maximizing flow time is not an effectiveness criterion for scheduling. Effectiveness criteria typically aim to minimize metrics such as waiting time, completion time, and work-in-process (WIP) inventory, or to maximize utilization, not to increase the time a product spends in the production process.