AK
Answered
Benoit Corporation's manufacturing overhead includes $14.20 per machine-hour for variable manufacturing overhead and $659,280 per period for fixed manufacturing overhead.Required:
Determine the predetermined overhead rate for the denominator level of activity of 6,700 machine-hours. (Round your answer to 2 decimal places.)
On Sep 23, 2024
Predetermined overhead rate = Estimated total manufacturing overhead/Denominator level of activity
= [(${{[a(1)]:#,##0.00}} per machine-hour × {{[a(3)]:#,###}} machine-hours) + ${{[a(2)]:#,###}}] ÷ {{[a(3)]:#,###}} machine-hours
= ${{[a(4)]:#,###}} ÷ {{[a(3)]:#,###}} machine-hours
= ${{[a(5)]:#,##0.00}} per machine-hour