Answers

CT

Answered

A process is considered out of control when ________.

A) special causes of variation are present
B) common causes of variation are present
C) process attributes are present
D) process variables are present

On Jul 12, 2024


A
CT

Answered

Simplify: (1 + i) x (1 + i)n

On Jul 10, 2024


(1 + i)n+1
CT

Answered

The equation: Total SS = SST + SSB + SSE, applies to the completely randomized design (one-way ANOVA model).

On Jun 12, 2024


False
CT

Answered

A logger knows the average time for his cutting machine to cut 20 trees is 9.8 minutes. A new machine on the market claims to cut the trees in less than 9.8 minutes. A random sample of 25 test runs on the new machine yielded a mean of 8.5 minutes with a standard deviation of 1.5. Does the sample data suggest the new machine cuts faster than the logger's machine? Test at the A logger knows the average time for his cutting machine to cut 20 trees is 9.8 minutes. A new machine on the market claims to cut the trees in less than 9.8 minutes. A random sample of 25 test runs on the new machine yielded a mean of 8.5 minutes with a standard deviation of 1.5. Does the sample data suggest the new machine cuts faster than the logger's machine? Test at the   = 0.05 level. Assume the cutting time is normally distributed and interpret your results. Test Statistic = ______________ ____________________________ The new machine ______________ cut faster than the logger's machine. = 0.05 level. Assume the cutting time is normally distributed and interpret your results.
Test Statistic = ______________
____________________________
The new machine ______________ cut faster than the logger's machine.

On Jun 10, 2024


-4.33; Reject the null hypothesis; does
CT

Answered

In developing an interval estimate for a population mean,the population standard deviation σ was assumed to be 8.The interval estimate was 50.0 ± 2.50.Had σ equaled 16,the interval estimate would be 100 ± 5.0.

On May 12, 2024


False
CT

Answered

Use synthetic division to divide. x4−4x2+6x−4\frac { x ^ { 4 } - 4 x ^ { 2 } + 6 } { x - 4 }x4x44x2+6

A) x3−2x2+6x−24+18x−4x ^ { 3 } - 2 x ^ { 2 } + 6 x - 24 + \frac { 18 } { x - 4 }x32x2+6x24+x418
B) x3−4x2+12x−48+198x−4x ^ { 3 } - 4 x ^ { 2 } + 12 x - 48 + \frac { 198 } { x - 4 }x34x2+12x48+x4198
C) x3+6x+10+28x−4x ^ { 3 } + 6 x + 10 + \frac { 28 } { x - 4 }x3+6x+10+x428
D) x3+x2+x+1+48x−4x ^ { 3 } + x ^ { 2 } + x + 1 + \frac { 48 } { x - 4 }x3+x2+x+1+x448
E) x3+4x2+12x+48+198x−4x ^ { 3 } + 4 x ^ { 2 } + 12 x + 48 + \frac { 198 } { x - 4 }x3+4x2+12x+48+x4198

On May 11, 2024


E
CT

Answered

$625 is invested each month for 2 years. Compute the future value if interest is 9% compounded monthly. Use Tables 23-1A and 23-1B or a calculator.​

On May 10, 2024


$625 × 26.18847 = $16,367.79 future value​