Answered
The goods required for the performance of a contract are destroyed without fault of either party prior to the time that the risk of loss passed to the buyer.In this case,
A) the contract cannot be cancelled.
B) the contract is voided.
C) the seller will not be excused.
D) the seller has to make good for the loss.
On May 27, 2024