The following data pertains to activity and utility cost for two recent periods:
Utility cost is a mixed cost with both fixed and variable components.Using the high-low method, the cost formula for utility cost is:
A) Y = $1.65 X
B) Y = $1.75 X
C) Y = $3,750 + $1.75 X
D) Y = $6,000 + $1.25 X