Answers

RK

Answered

A perfectly elastic demand curve implies that the firm:

A) must lower price to sell more output.
B) can sell as much output as it chooses at the existing price.
C) realizes an increase in total revenue that is less than product price when it sells an extra unit.
D) is selling a differentiated (heterogeneous) product.

On Jul 13, 2024


B
RK

Answered

Which of the following workers has only a limited right to refuse to do unsafe work?

A) a firefighter
B) a human resource management generalist
C) a factory worker at an assembly plant
D) a customer service representative at a bank

On Jul 12, 2024


A
RK

Answered

______________ is classified as a content theory.

A) ERG theory
B) Expectancy theory
C) Goal-setting theory
D) Equity theory
E) Probability theory

On Jun 13, 2024


A
RK

Answered

McDaniel Shipyards wants to develop control charts to assess the quality of its steel plate. They take ten sheets of 1" steel plate and compute the number of cosmetic flaws on each roll. Each sheet is 20' by 100'. Based on the following data, develop limits for the control chart, plot the control chart, and determine whether the process is in control.
 Sheet  Number of  flaws 112132405165708290102\begin{array} { | c | c | } \hline \text { Sheet } & \begin{array} { c } \text { Number of } \\\text { flaws }\end{array} \\\hline 1 & 1 \\\hline 2 & 1 \\\hline 3 & 2 \\\hline 4 & 0 \\\hline 5 & 1 \\\hline 6 & 5 \\\hline 7 & 0 \\\hline 8 & 2 \\\hline 9 & 0 \\\hline 10 & 2 \\\hline\end{array} Sheet 12345678910 Number of  flaws 1120150202

On Jun 12, 2024


 Total units sampled 10 Total defects 14 Defect rate, c-bar 1.4 Standard deviation 1.183216 z value 3 Upper Control Limit 4.949648 Center Line 1.4 Lower Control Limit 0\begin{array} { | l | r | } \hline \text { Total units sampled } & 10 \\\hline \text { Total defects } & 14 \\\hline \text { Defect rate, c-bar } & 1.4 \\\hline \text { Standard deviation } & 1.183216 \\\hline \text { z value } & 3 \\\hline & \\\hline \text { Upper Control Limit } & 4.949648 \\\hline \text { Center Line } & 1.4 \\\hline \text { Lower Control Limit } & 0 \\\hline\end{array} Total units sampled  Total defects  Defect rate, c-bar  Standard deviation  z value  Upper Control Limit  Center Line  Lower Control Limit 10141.41.18321634.9496481.40 \begin{array} { | l | r | }  \hline \text { Total units sampled } & 10 \\ \hline \text { Total defects } & 14 \\ \hline \text { Defect rate, c-bar } & 1.4 \\ \hline \text { Standard deviation } & 1.183216 \\ \hline \text { z value } & 3 \\ \hline & \\ \hline \text { Upper Control Limit } & 4.949648 \\ \hline \text { Center Line } & 1.4 \\ \hline \text { Lower Control Limit } & 0 \\ \hline \end{array}    Sample six is above the control limits; therefore, the process is out of control. Sample six is above the control limits; therefore, the process is out of control.
RK

Answered

Refer to Table 13-15. What is the marginal product of the sixth worker?

On May 14, 2024


Total output of four workers = 350 + 50 = 400 units. Total output of five workers = 400 + 25 = 425 units. 430 - 425 = 5 units.
RK

Answered

Which of the following is the infliction of deserved suffering on violators of society's most fundamental rules?

A) Rehabilitation
B) Deterrence
C) Probation
D) Retribution

On May 13, 2024


D