The activity rate for the Machine Setups activity cost pool under activity-based costing is closest to:
A) $156.56 per setup
B) $199.06 per setup
C) $189.58 per setup
D) $36.95 per setup
Activity Rate
The predetermined overhead rate used in activity-based costing to assign overhead costs to products or services based on a specific activity.
Machine Setups
The process and associated costs of configuring machinery to produce a specific product or batch of products.
Activity Cost Pool
A compilation of all the costs related to a specific activity or process in cost accounting.
- Assess the activity rates for cost pools as part of an ABC system.
Verified Answer
= $25,865 ÷ 700 setups = $36.95 per setup
Learning Objectives
- Assess the activity rates for cost pools as part of an ABC system.
Related questions
The Activity Rate for the General Factory Activity Cost Pool ...
Doles Corporation Uses the Following Activity Rates from Its Activity-Based ...
Neas Corporation Has an Activity-Based Costing System with Three Activity ...
Zwahlen Corporation Has an Activity-Based Costing System with Three Activity ...
Moorman Corporation Has an Activity-Based Costing System with Three Activity ...